Narragansett Bay Commission Combined Sewer Overflow Project

Phases I, II, & III

At the turn of the century, most urban areas across the nation built sewer systems to carry rain water and sewage in the same pipe. This is called a combined sewer. During dry weather conditions, the sewer system works fine. But, during heavy rain storms, these combined flows frequently exceed the capacity of the sewer system and overflow into local rivers and Narragansett Bay. This is a combined sewer overflow or CSO.

Chelsea Creek Headworks Building

Building Upgrade • Chelsea, MA

At the turn of the century, most urban areas across the nation built sewer systems to carry rain water and sewage in the same pipe. This is called a combined sewer. During dry weather conditions, the sewer system works fine. But, during heavy rain storms, these combined flows frequently exceed the capacity of the sewer system and overflow into local rivers and Narragansett Bay. This is a combined sewer overflow or CSO.

Rt. 146 Reconstruction

Erosion Control

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore.

Contact Us

Capital City Construction & Management Services, Inc.

27 Libera Street
Suite 1
Cranston, RI 02920

lori@capitalcityri.com
Office 401-464-4585
Fax 401-632-4585
Cell 401-632-2500

RI & MA certified WBE/DBE